What verified construction meansillustrative image
Insights · 5 min read

What verified construction means

On-site records, inspection by an identified technician and a preserved history: how Dominus Evidence turns progress into proof.

On almost every building site, the progress percentage is an estimate. Someone looks, does the maths and types a number into a spreadsheet. Sometimes it is right; sometimes it is not. Verified construction is the opposite: the number only changes when there is proof.

How it works, step by step

  • Whoever carries out a stage logs the work on site from a phone, with photos and a date. Access is through a site code, with no sign-up needed.
  • A technician from the developer, identified in the system, inspects the work and gives a verdict: pass or fail.
  • Only a pass moves the stage’s physical percentage — and with it, the progress of the whole project.
  • Neither the contractor nor the inspector can edit or delete a record. A correction is always a new entry, and the full history is preserved.
A fail never becomes progress. That is the whole point.

Why it matters

For buyers, it is the difference between being told the build is going well and seeing, stage by stage, what has been done. For lenders, it is measurement with photos, dates and a named inspector. For contractors, it is objective recognition of delivered work.

Open Site

When the client gives written consent, a project can have a public page — reachable through a QR code on the site hoarding — with verified progress, stages and photos approved one by one. The page never shows prices, client data or the exact address.

The Verified Construction Seal

The seal identifies projects verified with this method in Dominus Evidence, Grupo Dominus’ in-house technology. It is not a third-party certificate: it is a commitment that published progress has a source and can be checked.